Procurement

Doing business with SP

SP Group is committed to doing business and conducting its operations with integrity, honesty and in compliance with all applicable laws and regulations.

We require all our business associates to comply with SP Group's Supplier Code of Conduct.

Supplier Code of Conduct

Procurement SRM Portal

procurement-2

Find out more about current and upcoming opportunities to work with us.

SRM Portal

Current Opportunities

Enter our Supplier Relationship Management (SRM) Portal to find out more about current business opportunities.

Need help with SP SRM Portal? Call +65 6916 8839 (0830-1230H, 1330-1700H on Mondays to Fridays, excluding Public Holidays) or email srmsupport@spgroup.com.sg.

Find out more about the Terms & Conditions for the use of the SP SRM Portal here

procurement

Safety Performance Criteria

In line with SP Group’s principle of safety as our highest priority, SP Group is enhancing its tender evaluation framework to include a new Safety Performance criteria that takes into account the tenderer’s safety performance in their contracts with SP Group.

This new Safety Performance criteria will be applied for all tenders called from 1 April 2022 onwards and will account for a minimum of 10% of the total evaluation score. The criteria will consider if the particular tenderer had safety incidents while executing their contracts with SP Group in the past 2 years. Any occurrence of incidents that results in fatality or serious injury may also render the tenderer ineligible for award of the contract.

For more details, please refer to the policy document on the Safety Performance Criteria. 

Contractor Performance Management System

SP Group implemented the Contractor Performance Management System (CPMS) to strengthen its partnership with and improve the safety and quality performance of its contractors.

Through the CPMS, SP Group aims to take a holistic approach to the selection of its contractors as part of enhancing procurement process, by looking at the performance of its contractors at a quarterly and annual basis and not only based on performance at each individual contract basis. 

Upcoming Opportunities

All Categories
Jul - Sep 2023

Supply and Installation of 66kV Power Cable

TRANSMISSION CABLES
Apr - Jun 2023

Supply and Installation of 230kV Power Cable

TRANSMISSION CABLES
Oct - Dec 2023

Supply and Installation of 66kV Power Cable

TRANSMISSION CABLES
Oct - Dec 2023

Supply and Installation of 230kV Power Cable

TRANSMISSION CABLES
Apr - Jun 2023

Supply and Installation of 66kV Switchgear

TRANSMISSION EQUIPMENT
Apr - Jun 2023

Supply and Installation of 66kV Transformer

TRANSMISSION EQUIPMENT
Jul - Sep 2023

Supply and Installation of 66kV Switchgear

TRANSMISSION EQUIPMENT
Jul - Sep 2023

Supply and Installation of 66kV Transformer

TRANSMISSION EQUIPMENT
Oct - Dec 2023

Supply and Installation of 230kV Switchgear

TRANSMISSION EQUIPMENT
Apr - Jun 2023

Supply and Installation of 230kV Transformer

TRANSMISSION EQUIPMENT

bizSAFE Certification --- bizSAFE is a programme that promotes workplace safety and health through the recognition of the organisation's safety efforts. With effect from 01 April 2014, all new contracts & contractors involved in SP engineering construction and building operations works must meet the minimum bizSAFE Level 4 certification & safety requirements.

From 01 Oct 2021, the bizSAFE entry requirement shall be raised from bizSAFE Level 4 to bizSAFE Star. This shall apply to all Main Contractors participating in tenders advertised on or after 01 Oct 2021.

The bizSAFE entry requirement for  all sub-contractors will also be raised from bizSAFE Level 4 to bizSAFE Star from 01 Oct 2022. This will allow additional time for sub-contractors to conform.

Note: This does not apply to cable jointing or termination carried out by free-lance cable jointers; Ancillary work such as cable detection, survey works and third-party inspection works; Power turn-on by Licenced Electrical Worker; Supply and delivery; IT-related works (that does not involve electrical installation); and Consultancy services.

Debarment Policy --- SP will only work with responsible contractors/suppliers. To protect stakeholders’ interest, SP will debar contractors/suppliers for criminal offences, ethics violations, poor performance, withdrawal of tenders and other serious contractual non-compliances. Debarred contractors will not be allowed to participate in any SP tenders during the debarment period. The debarment period typically ranges from 1 to 5 years, depending on the severity of the contractor/supplier infringements. At the end of the debarment period, debarred contractors/suppliers can apply to our Procurement branch to be qualified as an eligible tenderer again. The applications are subject to our approval.